Material and Service Charges Summary for Renovation Project
Materials Costs and Fitting Charges Summary
Materials Costs
Item | Quantity | Rate (AED) | Total (AED) |
---|---|---|---|
WC Seat Cover | 2 | 200 | 400 |
Angle Valve Shutoff | 1 | 80 | 80 |
Power Socket (Single) | 1 | 50 | 50 |
Power Socket (Double) | 1 | 100 | 100 |
Spot Light | 2 | 35 | 70 |
Cobdodain Light | 4 | 50 | 200 |
Panel Light | 2 | 50 | 100 |
Hanging Light Bulb | 15 | 20 | 300 |
Total | 15 | 1,300 |
Thoughts:
The materials listed are primarily for bathroom and lighting fixtures, indicating a renovation or installation project. The notable items, such as multiple power sockets and hanging light bulbs, suggest a focus on lighting and utility. The total cost for materials is 1,300 AED, which is a significant budget item for any home improvement task.
Fitting Charges
Item | Charge (AED) |
---|---|
Hanging Light Fixing | 300 |
Curtain Fixing | 200 |
Power Socket Fixing | (not listed) |
Kitchen Light Fixing | (not listed) |
Washroom Light Fixing | 350 |
Seat Cover Fixing | (not listed) |
Shower Mixer Fixing | (not listed) |
Kitchen Cupboard Fixing | (not listed) |
Total | 850 |
Thoughts:
Fitting charges typically encompass installation labor costs, which can add to the overall expense of a renovation project. Focusing on critical installations, such as washroom and kitchen fixtures, indicates that these areas may require substantial work or upgrades. The total fitting charges amount to 850 AED, which, combined with the materials costs, leads to a comprehensive expense of 2,150 AED for the project.
Overall Total
- Total Materials Cost: 1,300 AED
- Total Fitting Charges: 850 AED
- Grand Total: 2,150 AED
Thoughts:
The grand total represents a significant investment for any home improvement project. Budgeting for both materials and labor is crucial for managing costs effectively. This breakdown also helps in assessing whether the expenses align with the expected outcomes of the renovations.
Extended readings: